Today I started working on the right flap. I clecoed the skeleton and bottom skin
together then checked the gap at the aft flange of the interior ribs. They needed
shims just like the left flap. Even the shim thicknesses were identical.
Here are the .032, .040, .040, and .032 shims ready for match drilling.